Sinkholes undermined the parking lot due to a deteriorated concrete seawall. In addition, the bridge adjacent to where heavy construction was to take place was in a critical state due to unbalanced and deteriorating concrete foundation piers. Land based and water inspections including a geotechnical subsurface investigation, concrete crack monitoring, and timber pile investigations were conducted. NE&C designed repairs for the bulkhead/ anchor system, parking surface, and marina access and specified both short and long term bridge improvements.
6 Valley Road Middletown, RI 02842 · p 401.849.0810 · f 401.846.4169 · info@northeastengineers.com
© 2024 Northeast Engineers. All rights reserved.