2 MW Wind Farm

NE&C evaluated the feasibility of building a 2 MW wind farm in an industrial park near an existing military airport. To minimize the cost and drastically shorten the project schedule, a SODAR machine was used for the meteorological study and a proactive Airspace Analysis was utilized to accelerate the FAA permitting process.

Services Provided

  • Feasibility Study
  • SODAR meteorological study
  • Power generation forecasting
  • FAA Permitting
  • Preliminary economic analysis
  • FAA Class 1A location certification