NE&C evaluated the feasibility of building a 2 MW wind farm in an industrial park near an existing military airport. To minimize the cost and drastically shorten the project schedule, a SODAR machine was used for the meteorological study and a proactive Airspace Analysis was utilized to accelerate the FAA permitting process.
6 Valley Road Middletown, RI 02842 · p 401.849.0810 · f 401.846.4169 · info@northeastengineers.com
© 2024 Northeast Engineers. All rights reserved.