During the Mapping phase, Northeast Engineers evaluates your site to determine if a renewable energy project is economically feasible. This requires an in-depth study to verify that there are no “fatal flaws” due to regulatory barriers or site characteristics.
Fatal flaws can include:
6 Valley Road Middletown, RI 02842 · p 401.849.0810 · f 401.846.4169 · info@northeastengineers.com
© 2024 Northeast Engineers. All rights reserved.